A new tile entry to Moosewalk Studios and Gallery takes shape through the very capable hands of Ian, our expert tile layer as art work begins to reappear on the newly painted walls. Once the tile is grouted and sealed the wooden floor covering the remainder of the floor will be laid. All should be ready for the grand re-opening of the gallery and studios on May 28.
A New Floor Appears
Previous post: Plein Air or Not To Plein Air
Next post: We Made It!



